BIM Case Study – Founded in 1841, Samford University is the 87th oldest institution of higher learning in the United States. Located in Homewood, Alabama just outside of Birmingham, the university consists of 10 schools including the Brock School of Business (BSB). To provide state-of-the-art educational environment and meet the needs of future students, the university needed a new building to house the Brock School of Business.
The newly constructed 4 story building includes multiple teaching labs, 11 classrooms, interactive breakout rooms, common areas, and a community resource forum able to host up to 400 guests. Based on a competitive interview process and their reputation of being progressive builders, Hoar Construction was selected as the general contractor even before the design of the building was complete. Davis architects was the architectural firm already on the project. By having Hoar Construction on board early in the project life-cycle the design team was able to make more informed decisions, which resulted in efficiencies throughout the project and helped further strengthen the relationship between all project stakeholders.
This case study describes how Hoar was able to use Assemble to:
- Work collaboratively with the architect
- Perform value engineering to meet budget requirements,
- Quickly evaluate design changes
- Perform rapid model takeoff
“We were dealt a very significant challenge – a 16% reduction in project scope and budget with a firm commitment needed within 5 working days for the project to proceed. Thanks to the technology on hand and the use of Assemble, (within 3 hours) our project team was able to have a path forward for the owner and designers to work with. This ability to quickly react with confidence would not have happened in the days of blueprints and pencils.”
Mike Waller
Project Executive
Hoar Construction